Cheeseboro Canyon Improvements

Posted |

Trailhead Improvements at Cheeseboro Canyon

Inner Lot: Demolish two existing non-accessible Romtec vault toilets and replace with one fully accessible double vault toilet. New trailhead amenities would include a fully accessible unpaved parking area with 36 standard vehicle spaces, 2 accessible spaces, and 5 equestrian trailer spaces, a shade shelter and a potable water distribution system with hose bibs, fencing, and a stormwater drainage system. The project would regrade the entrance road and parking areas to mitigate drainage issues and eliminate current flooding hazards posed to local residents. The project replaces an existing dirt parking lot and entrance road that the park “grandfathered” into service when the property was acquired for park land in 1980.

 

Bid Due: June 21, 2021