SURGE Newsletter

New Construction - Los Angeles (3/9/23)

Posted |

CSI Construction

Tesla Center

Official invite to Tesla Center TI in Encinitas (San Diego Area). 25k SF existing auto dealer/shop w/ mezzanines being stripped down for new Tesla Auto Center. Normal working hours. Demo is called out on Civils and Architectural sheets and MEP sheets. 1 year construction warranty. Specs are found both within in Plans A10.01 thru A10.03, provided Spec Book & Fixtures Excel doc.  Fire Protection - be sure to refer to paint booth Basis of Design pdf doc. Millwork/Finish Carpentry - Refer to Exhibit A3 Excel Spec Sheet for Corresponding items to furnish and install. You will be responsible for purchasing, delivery, offloading, etc. AC Paving/Site Conc. - refer to sheet E1.00 and A1.01 for scope of new and patch backs. Steel/Ornamental - refer to architectural for misc. needs like HSS tube steel for TV drops thru ceiling or corner guards. Rough Carpentry - backing only scope.  All bidders shall acknowledge: BIDs due: Thursday March 9th, 2PM PST FIRM RFIs due: Friday March 3rd, EOD All subs required to meet minimum insurance requirements below. No exceptions taken. *Insurance Requirements:  All subcontractors are required to meet the minimum insurance requirements, including: TEXTURA We will utilize Textura's on-line subcontractor billing and payment system on this project. All subcontractors will be required to use Textura

Bid Due: 3/9/23 at 2:00 PM

Place Bid Here