SURGE Newsletter

New Construction - Los Angeles (8/11/22)

Posted |

 

ESA South Construction

 

Install Dedicated Fire Suppression Water Distribution System and Replace Potable Water Lines 

The project includes site surveying and layout, demolition, asbestos abatement, CIP concrete, misc. metals, painting, fire suppression, advanced utility metering systems, earthwork and excavation, dewatering, asphalt and concrete paving, pavement markings, commissioning of site utility systems

Date: August 11, 2022

Time: 10:00 am

Place Bid Here