SURGE Newsletter

New Construction - San Diego

Posted |

Silverstand Construction

SANDAG - Bayshore Bikeway Barrio Logan Project

The work consists in general of approximately 2.3 miles of Class I bikeway along Harbor Drive between Park Boulevard and 32nd Street within the City of San Diego and Port of San Diego Tidelands. The bikeway will extend along the western side of Harbor Drive between Park Boulevard and Cesar Chavez Parkway. The bikeway will cross to the eastern side of Harbor Drive at Cesar Chavez Parkway, where it will extend to 32nd Street. Roadway improvements are required to accommodate the Class I bikeway. Features include raised concrete medians and buffers, concrete curb & gutter, asphalt concrete dike, curb extensions, concrete barrier railing, chain link fencing, street lighting, traffic signal modifications and other traffic safety measures linked to signage and striping.

Bid Due Date: 11/30/2021

Place Bid HERE